A Staff Court That Sheds Industrial Dust: Multi-Sport Facility at an Industrial Park
In a dust-heavy setting, a modular floor that does not hold dirt and takes load: low maintenance, and built to stay that way.
Key figures
- Area
- approx. 1,200 m²
- Courts
- 1 basketball court + 2 badminton courts
- Sport
- basketball, badminton, staff events
- Thickness
- 16 mm
- Programme
- about two and a half weeks (calendar days)
The court sits beside a production hall, where fine metal particles and dust settle on everything. Rubber matting traps that dust and is hard to clean, so housekeeping costs stay high. The plant needed a floor that sheds dirt and takes mechanical load — a maintenance vehicle now and then, at walking pace.
A 16 mm heavy-duty interlocking tile was used, with an oleophobic and hydrophobic top face: dust does not bond to it, and a pressure washer lifts the marks. The reinforced core gives point load capacity that suits occasional heavy items (capacity figure pending test report), enough to take a heavy item set down on the surface.
Cleaning water and housekeeping hours are both down. The court now carries staff basketball, badminton and plant-wide gatherings, and the support structure shows no permanent deformation under load.
To be confirmed
- Point-load capacity figure pending test report
- Third-party compression and environmental test laboratory and report number to be confirmed
Dust is a fact of life here, and the old floor was expensive to keep clean. This one hoses down fast and has handled the loads we put on it.
Project details anonymised at the client's request.